Text size :

Stefani: “For new Padua hospital, tender award in 2028”

ADNKRONOS

November 4, 2026

Venice, November 4. (Adnkronos Health) – For the new Padua hospital, “we must proceed with the executive design by 2027, the tender award in 2028, and the start of works at the end of 2028. Clearly, in case of appeals, it will start immediately after, at the beginning of 2029”. This was stated by the President of the Veneto Region, Alberto Stefani, today in Venice during a meeting with the press at Palazzo Balbi, presenting the financing plan for the new Padua facility.

“The new hospital for Venetians will have 963 beds – Stefani explains – a Day center with 6 floors, 27,300 square meters, 275 outpatient clinics, and 120 beds. The inpatient tower, which is not the research tower, has 10 floors, 69,770 square meters, and 822 beds. There is a high-intensity care block, 7 floors, 10,000 square meters, 90 beds, 32 diagnostic equipment. And the research tower: 8 floors, 21,500 square meters, a research biobank, and 6 levels dedicated to laboratories. The hospital will be a Green Hospital: 70% permeable surface, 1,499 new trees, 2,790 new shrubs.”

Today “we are talking about the financing of the new hospital” to “clarify the mosaic of funding, with the activation of a flexible loan of 380 million which we hope can also be reduced over time. In the program agreement – the president specifies – there was and still is the issue of the Giustinianeo hospital, on which we confirm our commitment: 719 beds, of which 50 are for the Community Hospital and 140 for the Veneto Oncology Institute. Regarding the Sant’Antonio hospital, I considered it fundamental to confirm our commitment to enhancing the structure.”

Jiji Press

Related

Page TOP