(Adnkronos) – “In recent years, the sector has made significant strides in technological innovation and in plants for recycling personal absorbent products. Today, a new phase is opening, in which every actor in the supply chain can play their part. As manufacturers, we have an active role throughout the entire product life cycle, from design to its end-of-life, and we want to better understand how our products perform in recovery processes, as product sustainability will also need to be evaluated in the future based on their performance within the recycling process,” stated Massimo Minaudo, Country Manager Italy and Senior Business Director Ibit of Essity.
“Italy today possesses expertise, technologies, and a regulatory framework that place it among the most advanced experiences in Europe in the recycling of personal absorbent products, transforming one of the most complex wastes into a resource. The real challenge now is to ensure that the investments initiated generate lasting industrial supply chains, capable of transforming a complex waste stream into a resource and new opportunities for the country – emphasized Giorgio Zampetti, general director of Legambiente – This is precisely the most concrete meaning of ecological transition: building industrial models capable of combining environmental benefits, innovation, and economic development.”
According to Marcello Somma, CEO of i-Foria, “these results demonstrate that circularity does not depend solely on more efficient recycling plants, but also on products designed to be better recycled. Their composition can concretely influence the performance of industrial processes, energy consumption, and the quality of recovered materials. The collaboration with Essity demonstrates how important it is to integrate technological innovation and industrial capacity to develop a truly circular supply chain, transforming the end-of-life of products into a source of secondary raw materials, new industrial applications, and opportunities for economic growth and environmental sustainability.” Alberto Mattesco, head of the Secretariat of the Deputy Minister of Environment and Energy Security, in his speech provided assurances on the timeline for the implementation of Pnrr absorbent product recycling plants, emphasizing that projects that have reached a good level of maturity will certainly be completed during 2027 and 2028.